12F.2

BIM Takes Care of It

Posted 33 days ago

We’ve recently completed our part in a mixed-used care facility in Bordon, Hampshire. The site not only accommodates a residential care home and separate, monitored independent living units, but also 4 existing...

READ MORE...
thfc night aeriel 30percent

Two Teams, One Goal

Posted 46 days ago

TDS are very pleased to be working alongside our sister company, Design4Structures, on the extensive redevelopment of Tottenham Hotspur Football Club’s home ground.

READ MORE...
OneOsnaburgh

Patterns in the Penthouse

Posted 3 months ago

One Osnaburgh is a prestigious residential tower next to London’s Regent's Park. Our project for the Level 16 duplex refurbishment was to detail, for fabrication, the steelwork and aluminium for an architectural...

READ MORE...
Lynemouth power plant credited to Joh 1280x720

The Power to Change

Posted 4 months ago

Lynemouth was a traditional coal-fired power station dating from the 1970s that was facing closure by the end of 2015.

READ MORE...
Article Image The Crescent

Tall Storey Time

Posted 4 months ago

TDS were pleased to be involved in a project that breaks new ground for our client Elements Europe.

READ MORE...
Rams mark up article image

Cheers to a Successful Redevelopment

Posted 5 months ago

The RAM Brewery is an extensive redevelopment of an historic site at the heart of Wandsworth town centre, southwest London.

READ MORE...
Lambeth2

Building a Career with TDS

Posted 5 months ago

Lambeth’s historic Town Hall is a Grade II listed building at the heart of a busy community in Brixton, South East London.

READ MORE...
resizedimage600365 pokemongologo

Pokemon Go: Teaching us BIM?

Posted 15 months ago

There is nothing like a hugely successful global gaming phenomenon to throw light onto developments in the built environment.

READ MORE...
tekla

Tekla UK BIM Award Winners: North Walsham Containment Enhancement

Posted 16 months ago

TDS are winners of the Tekla UK BIM Industrial Projects Award! The North Walsham containment enhancement project saw us work on a steel structure bolted onto an existing reinforced concrete/masonry structure to provide essential protection against a catastrophic leak of the liquid gas housed there.

READ MORE...

STAY IN TOUCH - SIGN UP FOR OUR NEWSLETTER